Open Pit Mine Control Center Office

Completed Open Pit Mine Control Center Office at Oyu Tolgoi
Oyu Tolgoi mine site Completed facility
Operation Open Pit Mine Control Center Office
Client Oyu Tolgoi LLC
Role EPC Contractor
Location Oyu Tolgoi Mine Site, Khanbogd Soum, Umnugovi
01 The brief

Open Pit Mine Control Center Office

Engineering, Procurement, Fabrication, and Construction of a New Open-Pit Mine Control Center Office Building:

02 The system

Built as modules.
Delivered as one.

Core and shell, utilities and interior finishes were coordinated as one prefabricated system before installation at the operating mine site.

02

Blocks

One permanent operational workplace.

1,566

Square metres

Total project footprint.

87

Modules

Fabricated at the Khanbogd workshop.

07

Months

From delivery programme to commissioning and handover.

Two-block modular mine control center office
  1. 01

    Permanent operational footprint

    Two Blocks with a 1,566 m² Total Footprint, Permanent Facility Designed for Uninterrupted Control and Dispatch Operations.

  2. 02

    Turn-key EPC scope

    Turn-Key EPC Scope (including State commissioning)

  3. 03

    Compressed delivery programme

    Starting from a concept design sketch in October 2025, our project team collaborated closely with the client’s team to compress the project delivery schedule.

  4. 04

    Concurrent EPC coordination

    The requirement to complete these facilities in a short timeframe challenged the team to manage the following EPC aspects concurrently:

  5. 05

    Integrated modular design

    Designed all aspects of the building including main envelope (core & shell), utilities, and interior finishes using modular prefabricated building technology.

  6. 06

    Fast-track procurement

    Procurement of all building materials fast-tracked alongside detailed design phases.

  7. 07

    Fabrication close to site

    Fabrication of all 87 building modules at our Khanbogd Workshop closely located to the mine site, including the subsequent delivery and erection of all modules at the OT site. Fabricating the building modules near the project site contributed toward overall cost efficiency of the building as well as shorter lead time for overall project delivery.

  8. 08

    Winter construction

    Construction: Most of the onsite construction activities took place during winter months in extremely cold weather - demonstrated the advantage of utilizing the prefabricated modular building technology.

04 Project value

Prefabrication moved quality, schedule and weather risk into a controlled environment.

01

Programme certainty

Parallel design, procurement and fabrication compressed delivery without separating responsibility across the EPC scope.

02

Winter resilience

Off-site module production reduced exposure to extreme winter construction conditions at the mine site.

03

Local value

Fabrication in Khanbogd and collaboration with local suppliers kept capability and project value in Umnugovi.